Sign in

Version history

Issued versions accumulate and nothing overwrites an issued release. Save the draft without issuing it, and restore a saved version or any full issue.

Updated November 17, 2026
6 min read
reports
collaboration

Everything below lives on one page: Versions and sharing, from the Report tab of a project.

Issuing a version

Issuing takes the current state of the report and freezes it as a release, with a version identifier, a timestamp and the person who issued it. Continuing to work on the project does not alter that release.

This is what makes a shared report answerable months later: the version the committee read still exists, exactly as they read it.

Before an issue goes out

When something deserves a look first, pressing Issue shows it under Look at these first instead of issuing:

  • requests the target is still asked for that no longer apply to this project, which you can withdraw on the request list;
  • checks the documents would rule out that wait for someone to Confirm them, or pin the fact, on the Checks tab, except a Baseline check, which never reaches an issue, so its Confirm waits on the Checks tab alone;
  • areas written before their checks changed, which the next Re-analyze rewrites unless they are locked.

Areas not written are named on the same list when it appears, but they never hold an issue back: the Issue dialog says how many there are before you press Issue, and the issue states each one as not written. Written areas nothing rated are named the same way, and the issue shows each one as Not Assessed. The dialog also names a summary that is behind the areas it summarizes, which an issue would carry as it stands, and, before you press Issue, the areas written under an earlier release of the checks. Rebuild all sections writes those under the current checks, except a locked one, which the dialog names as kept. They never hold an issue back either.

Each item is listed by name. Issue anyway acknowledges every item on the list and issues the report as it stands, and the release records each item, areas not written included, by name, with who issued it and when. Nothing on the list stops an issue, and if the list cannot be worked out, the issue goes ahead without it.

The list is for your team. It is not part of the issued report, and neither the people you share the report with nor the target ever see it.

What accumulates

Every issue is kept, newest first, with the working draft at the top of the same timeline so you can see how far ahead of the last issue you are.

Each issue carries a plain-language summary of what changed since the previous one — ratings that moved, elements added, rewritten or removed, and sections that arrived or went. Those sentences are counted from the two frozen documents when the version is issued, not estimated, so the numbers are exact.

Comparing any two versions

What changed opens a full comparison of any two versions, or of the draft against a version. It leads with the same summary sentences, then the counts, then the detail section by section, with rewritten prose marked word by word.

A version is only ever compared against another of the same edition. A board pack is a subset of the full report by design, so comparing the two would report the whole technical appendix as deleted every time.

Saving a version without issuing it

Save version keeps the working draft exactly as it is, for your team only. Nothing is issued, nobody outside your team can open it, and no recipient is told. Use it before a big change you may want to undo.

A saved version holds everything a restore needs: every section, every element, the elements you locked or reviewed, and the original drafts kept behind elements you rewrote. Saved versions are listed on the same page with who saved them and when, and each can be compared with the draft, restored or deleted.

Some saves happen on their own: before any restore, and before the whole report is regenerated. They are marked Automatic, and the newest 20 are kept. A version you save yourself stays until you delete it.

Restoring

Restoring a saved version puts the draft back to exactly what it was, including whether its summaries were behind their areas. Any full issue can also be rolled back into the working draft, and its summaries come back as issued. Either way the draft you had is saved first, so a restore can itself be undone.

Restoring does not delete later releases; it brings an earlier state back to work on, and the history records that it happened. An audience edition cannot be restored — it contains a subset of the report, so restoring from it would discard the rest.

Sharing a specific version

A share points at one release, not at "the latest". An external reader's access does not silently change under them when you issue again — you decide whether to give them the newer version.

Because of that, an earlier issue stays readable by whoever holds it until you close it. The page states this at the top: how many people can open the report, how many of them hold a version you have since replaced, and how many of those have never been given the current one. Close the earlier issues takes that access back in one action.

Withdrawing a version

Withdrawing stops a version being readable by anyone outside your team. Links already sent say the report was withdrawn rather than failing, the version stays in the history with the reason recorded, and it can be reinstated.

Withdrawing and un-inviting are separate on purpose. Withdrawing closes the document and keeps the recipient list, so reinstating restores access to exactly the same people; Stop sharing removes the recipients and leaves the version readable to your own team. You can do both at once when that is what you mean.

Availability

Part of the plans that include report version history. Without it you keep one live issue — publishing again replaces it rather than adding to the history — and who can open that issue is still shown and controlled in the same place.

Next

Was this article helpful?

Votes are read: an article that keeps failing gets rewritten.