Technical due diligence checklist (2026)

These are the 80 requests in the standard Percomb request list, 50 of them High priority, with the good evidence and red flags for each.

The wording is shortened from the template's, and the bracketed number is each item's reference in it.

How the request list is used

Each item names a document, record or demonstration, the area it feeds and its priority, and the findings rest on the answers and the gaps.

Software4 requestsSecurity10 requestsArchitecture& Design6 requestsPerformance& Scalability5 requestsAI/ML5 requestsOpen Source4 requestsEngineeringProcess6 requestsPeople &Organization7 requestsProductManagement7 requestsSuitability forTarget Market2 requestsTechnicalOperations9 requestsSupport& Services8 requests

Each of the 80 requests is one arc in the area it feeds.

On the buy side

  • Cut the list to the deal: sixty relevant asks get answered faster than three hundred generic ones. A thesis that rests on scale keeps every Performance & Scalability item and trims Support & Services to the contracts.
  • Send the High items first, and the three Stretch items (usage analytics, cloud costs and engineering spend) when the case depends on margins at scale.
  • Ask for the artifact: a dated record from the live system, a timestamped log, a signed agreement or a demonstration says more than a paragraph written for the occasion.
  • Read every answer against the deal materials, since many findings begin as a pitch-deck sentence that no technical document repeats.
  • Treat an unanswered item as a result: rate the gap on what the absence alone justifies, ask again, and report it if it stays open.

Percomb tracks five states per request: Not started, In progress, Complete, Blocked and Not available.

On the sell side

A company preparing for a sale runs the same list on itself before a buyer's adviser does, while there is time to fix what it finds. Our sell-side page covers the preparation.

  • Collect the documents that exist, and say in a sentence where one does not. A stub written the week before a process reads worse than a plain "Nothing to provide".
  • Fix the cheap gaps first. Unsigned contractor IP assignments, a backup nobody has restored and an out-of-date architecture diagram cost little to fix early and a lot to explain mid-deal.
  • Give a gap that cannot close in time a costed plan with an owner and a date. Found late by the buyer's adviser, it tends to bring a price adjustment; disclosed early with a plan, it is a line in the remediation budget.

Deal materials

The template opens here, before any engineering question, because most of management's claims come from these documents.

Request [ref]Good evidenceRed flags
Pitch deck, CIM, teaser and business plan [0.1–0.4]Current versions that agree on product, customers, team size and roadmapTechnology claims no technical document repeats; figures that differ between deck and CIM
Company fact sheet: entities, ownership, locations [0.5]An entity chart showing who owns the code, domains and cloud accountsCode, domains or cloud accounts held by a founder personally, or outside the deal
Product overview and demo materials [0.6]A demo of the shipping product, with live features kept apart from planned onesRoadmap features demonstrated as live
Previous due diligence reports or public disclosures [1.2]Earlier reports, with what has been fixed sinceEarlier findings still open; a report that exists but is withheld

Software

Could someone who did not write the code maintain and extend it?

Request [ref]Good evidenceRed flags
Three to five key workflows to trace through the code [7.3]The workflows that carry the revenueThe review steered toward the newest, cleanest module
Repository access or an extract, to review structure and coding patterns [7.4]The target's own code sized apart from generated and vendored code; technical debt measuredDebt nobody has measured; "temporary" workarounds that are years old
Coding standards across repositories [7.5]Written standards, enforced by linters and reviewStandards that live in one engineer's head
Static analysis results from the target's own tools [7.6]Current results with a trend, and a gate on mergesStale results, or rules switched off to make them pass

Security

Is customer data protected, by design and in operation? In a multi-tenant product, ask by name for how one customer is kept out of another's data and the layer that enforces it; the template folds that into 11.2.

Request [ref]Good evidenceRed flags
Security practices and procedures [11.1]Current procedures with owners and review datesAn off-the-shelf policy pack with the company name pasted in
Controls for data at rest, in transit and in use, and for credentials: SSO, MFA, access management, encryption [11.2]MFA enforced for staff and administrators; encryption described end to endOptional MFA for administrators; shared accounts; secrets in source code
Encryption key management [11.3]A managed key service or hardware module, with rotation loggedKeys stored beside the data, or never rotated
Access policies for production, staging and development [11.4]Least privilege, and the last two access review recordsDevelopers with standing production access; no reviews
Information security policy [11.5]Approved, dated and reviewed in the last yearUndated, or older than the current architecture
Privacy policy, and the security, privacy, confidentiality and IP terms given to customers and partners [11.6, 14.4]Policies that match the contracts and what the product does with personal dataContracts promising controls the company does not run
Penetration test results and remediation log [11.7]An independent test in the last year, findings tracked to closureNo test; high-severity findings with no closure date
Incident reports and the incident policy [11.8]Written reviews with root causes and completed actionsIncidents described only from memory
Certifications and attestations, such as ISO 27001 or SOC 2 [11.9]Current certificates or reports, with the scope stated"In progress" presented as held; a scope that excludes the product

Architecture & Design

Is the system built to change, and what would it cost to integrate? Ask by name for the disaster recovery plan, its recovery objectives and the date it was last tested.

Request [ref]Good evidenceRed flags
A full list of client and server technology and services, with versions and the hosting model [3.1]One inventory, with versions, that matches the diagrams and the invoicesComponents past end of support; invoiced services that appear on no diagram
Infrastructure diagrams covering deployment, network, storage and failover [3.2]Current, dated diagrams that match what is deployedA diagram older than the last migration; no failover
Product architecture documentation [3.3]A structure the team can explain, with the reasons recordedMore microservices than the team can run, or a monolith nobody can change safely
Data model and ER diagram [3.4]A current model, with the flows between storesNo model at all
API documentation [3.5]Versioned APIs and an inventory of integrationsOne-off integrations documented nowhere
Third-party dependency documentation [3.6]Each service listed with what happens when it failsOne supplier the product cannot run without, and no fallback

Performance & Scalability

Does the product hold up at the volume the deal thesis assumes? All three Stretch items sit here.

Request [ref]Good evidenceRed flags
Load test results, the uptime SLA and proof of meeting it [7.1]Tests at the volume the plan assumes; uptime reports that match the SLAScale argued from the design and never tested
A live look at cloud dashboards, with separate test and non-production environments [7.2]Real current load, and load tests run outside productionProduction is the only environment
Web analytics or usage logs, by week or month [1.3]Usage that moves with the reported customer numbersFlat usage while customer numbers grow
Cloud usage and costs, with monthly invoices [13.9]Cost by month and the driver it scales withCost growing faster than revenue, and nobody able to say why
Engineering budget and spend [14.1]A budget that reconciles to the invoicesTechnology spend held outside the budget

AI/ML

Ask this area only where AI is part of the product. The template asks the target to name the application (natural language processing, computer vision, image recognition), which separates models the company built from features built on someone else's.

Request [ref]Good evidenceRed flags
How AI/ML is used, by named application and as narrowly as possible [6.1, 6.4]Each feature mapped to the model or service behind it"AI-powered" in the deck, and no feature to point to
The models used, and whether they were built for this product [6.2]Proprietary, fine-tuned or third-party, stated per model, with evaluation resultsProprietary models claimed, prompts to an outside service found
Third-party AI/ML services relied on [6.3]Contracts covering what happens to customer data sent to themPersonal data sent out with no agreement covering it
Training and evaluation data [6.5]The right to use the data, its lineage, and versioned modelsUnclear rights; no record of which data trained which model

Open Source

Does third-party code create legal or security exposure? The template asks about licensing, so raise known vulnerabilities and abandoned packages in the same conversation.

Request [ref]Good evidenceRed flags
Software bill of materials, with licenses [4.1]A generated SBOM for each product, current to the latest releaseA hand-kept list, or none
Component inventory with copyright, code and tools [4.2]Each component identified, with modifications notedCopied-in code with its license header removed
How third-party license obligations are met [4.3]A policy on which licenses are allowed where, followed in practiceGPL code in distributed software; AGPL code in a service customers use over a network
Examples of the license types in use [4.4]Counts by license family, with the unusual ones explainedUndeclared licenses; abandoned packages with known vulnerabilities

Engineering Process

Do changes reach production safely and predictably?

Request [ref]Good evidenceRed flags
The development lifecycle, and whether the team is in-house, hybrid or outsourced [12.1]A written process the ticket and commit history bear outA process nobody follows; core work outsourced without oversight
Tooling, coding standards, code review and CI/CD practice [12.2]Every change reviewed, with branch protection enforcing itDirect pushes to the main branch; reviews skipped under deadline
Test frameworks in use [12.3]Frameworks that match the stack, in active useFrameworks installed and few tests written
Evidence of automated testing, and how coverage is measured [12.4]A coverage report and the CI checks that gate a mergeNo automated tests, so every change is a manual regression risk
The ticketing tool, backlog and current sprint [12.5]Tickets linked to commits; a backlog that matches the roadmapYears of unprioritized tickets
Build and deployment pipeline, branching strategy and release history [12.6]Automated builds, a year of releases and a rollback procedureReleases that depend on one person's laptop

People & Organization

Can the team keep building the product when someone leaves? Key person risk is rarely absent in a small team, so ask whether anyone has measured it.

Request [ref]Good evidenceRed flags
Org charts with reporting lines and key individuals [1.1]Headcount by function and location, with tenureMore engineers on the chart than commit to the code
Resumes of key technical staff [9.2]Experience that matches the roadmapNobody owning security, operations or QA
Incentives, pay against market, and training [9.3]Retention arrangements for the people the deal depends onKey people with no reason to stay after close
Retention and attrition, remote work policy, skill gaps [9.4]Two years of engineering joiner and leaver dataRecent exits from the core platform team
Employment contract and contractor IP assignment [9.5, 14.3]Signed IP assignment from everyone who wrote codeContractors who never signed; a founder's early code never assigned to the company
Roles filled by contractors or vendors [9.6]A contract and a handover plan for eachA core component owned outside, with no second owner in-house

Product Management

Does the team build the right things and ship them when it says it will?

Request [ref]Good evidenceRed flags
Product roadmap, twelve months or more [5.1]Dated and tied to strategy, from a team that meets its datesAn undated feature list; dates that slip every release
Product documentation [5.2]Current for what ships todayDescribes a product that no longer exists
Planned features and technology changes, with timing [5.3, 2.3]Owners, estimates and dependenciesA re-platforming that has never been costed
How an idea reaches customers [8.1]A defined path, visible in the toolsFeatures built for one customer outside the process
How customer feedback is tracked [8.2]Feedback that becomes tracked workPriorities set by whoever asked last
Five to ten features to focus the review on [8.4]Choices that match the deal thesisChoices that avoid what the thesis depends on

Suitability for Target Market

Does the product fit the customers it is sold to? This area leans on the deal materials and adds two requests of its own.

Request [ref]Good evidenceRed flags
Market analysis and the go-to-market case [8.3]Segments named, with the product's fit for eachAn enterprise sales plan for a product with no SSO, audit logs or SLAs
The commercial model: subscription, freemium or trial [15.1]A model the architecture and the support team can carrySelf-serve pricing on a product that needs an engineer for every onboarding

Technical Operations

How does the product run in production, and what happens when it breaks?

Request [ref]Good evidenceRed flags
Material services and suppliers, with their contracts [13.1, 14.2]A contract and an exit route for eachCritical services on a personal account or a free tier
Deployment automation [13.2]Repeatable deployments without downtimeA maintenance window and a named engineer for every release
Backup and restore procedures, with timestamped proof [13.3]Restore tests in the logs, against stated recovery objectivesBackups nobody has restored
Monitoring and alerting, shown live [13.4]Alerts to an on-call rotation, with thresholds tied to the SLACustomers notice failures first
From alert to customer ticket, and the time to restore [13.5, 13.6]An incident process, an on-call schedule and the last three post-incident reviewsResponse that depends on who is awake
Deployment runbook [13.7]One a new engineer could followDeployment knowledge held by one person
Availability commitments to customers [13.8]SLAs the monitoring can evidenceSLAs nobody measures; credits owed and unpaid

Support & Services

How are customers looked after once they have bought, and how much of the revenue depends on people rather than software?

Request [ref]Good evidenceRed flags
Support structure and the system behind it [10.1, 15.2]Tiers, tools, response targets and SLA reportingEngineers answering a shared inbox
A look at the support tooling [10.2]Tickets with ages, owners and resolution notesNo ticket history from before the deal
Support metrics: open tickets by age, response and resolution times, CSAT or NPS [10.3]Reported on a schedule, with trendsMetrics assembled for the first time for the diligence
Documentation and in-app help [15.3, 15.4]Current documentation customers can findEvery question answered by a person
Language coverage, onboarding and training material [15.5]Onboarding that runs without engineersBespoke engineering for every implementation
Client contracts: MSAs and SOWs [14.5]Standard terms, with services revenue kept apart from subscriptionCustom commitments the product does not meet

What happens to the list in Percomb

A new Percomb project opens on this list. Files arrive against the item that asked for them, from your team or from the target's Contributors, who work the list without a paid seat and see none of your analysis. A question the documents cannot answer goes back on the list under Evidence gaps.

The questions were written by practitioners across hundreds of completed transactions, and nothing is issued until an analyst has reviewed it.

Try it on a finished project. The sandbox's sample project shows requests completed, blocked and answered "Nothing to provide". For a live target, see the ways to engage or talk to us.

Questions

Frequently asked questions

What is a technical due diligence checklist?

The list of documents and evidence a buyer or investor asks a target to provide about its technology, also called a request list or DRL (diligence request list). This one has 80 items in 16 sections, grouped by the twelve areas a Percomb report rates.

Is a technology due diligence checklist different from a technical one?

No, the names are interchangeable. "IT due diligence" can mean only internal systems such as finance and HR software, and "software due diligence" the product and its code; this list covers the product and the team behind it.

Should we send all 80 items?

Usually not. Cut the list to the deal thesis and the target's size, send the High items first, and keep the AI/ML section only where AI is part of the product.

What does "Nothing to provide" mean?

The target's answer when a requested document does not exist, recorded with a reason and the name of whoever gave it. It closes the request as Not available, and the absence still counts as evidence: a missing disaster recovery plan is a finding in its own right.

Does the checklist cover source code?

Yes. Items 7.3 to 7.6 ask for repository access or an extract, coding standards and static analysis results, and the Open Source section asks for a software bill of materials. Our source code due diligence page explains how Percomb reads private code with no credential to the source host.

Can we use this list in Percomb?

Yes. A new project opens on it, the template can be edited for an engagement or under a practice arrangement, and the standard list can be put back at any time; the request list help article explains how items close.